Set start and due dates and times

Pick dates in one tap, type them in your own words, and see the whole timeline.

2 min read

The Schedule section holds when work starts and when it is due. Each has a date and an optional time. Times are “wall-clock” times: 3:00 PM shows as 3:00 PM for everyone.

The Schedule section.

Zoom in on each part

  1. Type it box
  2. Start card
  3. Due date
  4. Due time (optional)
  5. One-tap choices
  6. Timeline
  7. Heads-up

Three ways to set a date#

  • Pick it in the Date box, and add a Time if it matters. The time box turns on once there is a date.
  • Tap a choice, such as Today, Friday, Next Monday, In 2 weeks or End of month. For the start there are also A week before due and Same day as due.
  • Type it in your own words, then press Enter or choose Set due (or Set start). IdeaLine shows what it understood before you set it.
TypeYou get
fri 3pmThis Friday at 3:00 PM
tomorrow 9amTomorrow at 9:00 AM
next monMonday of next week
in 2 weeks, 3d, +10That many weeks or days from today
oct 30, 30 oct, 10/30That date (next year if it has passed). Day-first dates follow your date format setting.
eow, eomThe end of this week (Friday) or month
noon, eod12:00 PM, or 5:00 PM

The timeline#

Below the cards, a line shows the window from the start (or today) to the due date, a marker for today, and a dot for every subtask with a micro-due date. A red dot is a step that lands after the due date. Screen readers hear a one-sentence summary of the same timeline.

Heads-ups#

IdeaLine points out, calmly and without blocking you, when:

  • the start is after the due (this one must be fixed before saving)
  • the due date has passed and the project is not done
  • a subtask is due after the project, or is overdue
  • time is tight: three or more open steps and two working days or fewer left
  • the due date falls on a weekend
  • the assignee already has three or more other projects due that week
Tip

The due time shows on board cards and calendar items, and goes into calendar files and calendar feeds. A Content, Social media or Email item still counts as needing scheduling until it has a publish time.